久久女厕一次看个够_免费国产A级午夜视频_能免费看动漫情侣网站_欧美中日韩亚精品自拍_牛牛国产在线精品大陆_加勒比人妻综合社区_午夜国产无码片_免费无码专区毛片_你懂的网站在线在线_日日骚网址无码中文字幕

Cases

Huizhi New Energy is committed to building a complete energy storage technology architecture, achieving full coverage of product layer, system layer, and platform layer, and providing safe, efficient, and economical comprehensive solutions for various energy storage scenarios.

  • Home
  • /
  • Cases
  • /
  • Energy Storage AGC Auxiliary Frequency Modulation Project of Guangzhou Huadian Shaoguan Thermal Power Company

Energy Storage AGC Auxiliary Frequency Modulation Project of Guangzhou Huadian Shaoguan Thermal Power Company

Scale10MW/10MWh

LocationShaoguan, Guangdong

TimeMarch 2021

OverviewThis project is the first advanced cascade+1C power side energy storage project in China. A 10MW grid level energy storage system based on lithium-ion batteries will be built on the # 1 and # 2 generator sets of Xiongzhou Power Plant. The energy storage system adopts a "one driven two" method, which is used for joint units to participate in grid AGC frequency regulation. The energy storage system can significantly improve the regulation performance of thermal power units by assisting them in frequency regulation, which is of great significance for building a strong power grid and improving the current situation of thermal power plants.

Recommendation