Wanhua Xinjiang Border Defense Micro Network Project
Scale52 construction sites, totaling 5MW/4.5MWh
LocationAli in Tibet, Hotan in Xinjiang
TimeSeptember 2020
OverviewIntegrate lithium-ion energy storage, optical storage integrated converter, AC/DC distribution cabinet, intelligent control system and other equipment into a microgrid control system, effectively ensuring the basic daily electricity consumption of soldiers in the barracks.